Proven Outcomes

Case Studies

Real engagements. Verified savings. See exactly what Instant Reach delivered for industrial and commercial consumers across India.

₹12Cr+

Total Annual Savings Delivered Across Clients

500+ MW

Total Capacity Advised and Transitioned

45 Days

Average Open Access Approval Timeline

28%

Average Energy Cost Reduction Per Client

Open Access ↓ 28% Cost Reduction

Karnataka Textile Mill — Open Access Approval in 45 Days

A large textile manufacturer in Karnataka had been paying HT tariff of ₹7.85/unit. Their in-house team had struggled with open access approvals for 8 months. Instant Reach secured STOA approval within 45 days and transitioned them to third-party renewable power at ₹5.60/unit.

28% Per-unit cost reduction
45 Days Approval timeline
₹2.4Cr Annual savings
GM
General Manager – Operations Large Textile Manufacturer, Karnataka
Full Story →
PPA Structuring ₹2.85/unit PPA

Maharashtra Industrial Conglomerate — 25-Year Bankable Solar PPA

A diversified industrial group in Maharashtra needed a long-term, lender-ready PPA for their 10 MW captive solar plant. Instant Reach structured a 25-year fixed-rate agreement at ₹2.85/unit — well below their prevailing DISCOM tariff — and supported due diligence for project financing.

₹2.85 Per unit PPA rate
10 MW Captive solar capacity
₹3.8Cr Annual savings
VP
VP – Finance Industrial Conglomerate, Maharashtra
Full Story →
Liaison & Approvals 80 MW On Schedule

Rajasthan IPP — Evacuation NOCs for 80 MW Wind Project

An Independent Power Producer developing an 80 MW wind project in Rajasthan needed simultaneous evacuation approvals from RRVPNL, SLDC, and forest department. Instant Reach coordinated all three tracks in parallel, securing approvals within 90 days and keeping the project on its commissioning schedule.

80 MW Wind project capacity
90 Days 3-agency approval timeline
3 Agencies coordinated
MD
Managing Director Independent Power Producer, Rajasthan
Full Story →
Exchange Trading ↓ 22% Cost Reduction

Tamil Nadu Auto Parts Manufacturer — IEX Trading Portfolio

A high-tension auto components manufacturer in Tamil Nadu with 4 MW contracted demand was paying peak HT tariff. Instant Reach designed a hybrid procurement strategy using Day-Ahead Market and Green Term-Ahead Market on IEX, blended with a short-term PPA, cutting effective per-unit cost by 22%.

22% Cost reduction achieved
4 MW Contracted demand
₹1.2Cr Annual savings
GM
General Manager – Projects Auto Parts Manufacturer, Tamil Nadu
Full Story →